Engineering application guide
PV Ribbon for Your Module and Stringing Process

Match the ribbon to the cell layout and stringing process. Specify interconnect or busbar duty, width and thickness, coating alloy, soldering conditions and spool format. For a composite-ribbon trial, compare joint quality and resistance in the actual module layout before setting the production specification.
Send Your Ribbon and Stringing RequirementsOn this page
Locate the material in the assembly
Locate each ribbon in the module
Scroll horizontally to read all columns. Keep the conditions and units with each value.
| Position | Current-path function | Candidate product |
|---|---|---|
| Cell to cell | Join metallized cell contacts into a string | Composite interconnect ribbon |
| String to string / module connection | Collect current through the busbar path | Composite busbar ribbon |
| Round-wire cell layout | Connect the specified cell contact arrangement | Composite round solar ribbon |
The copper-aluminum conductor and the solder coating perform separate jobs. Define the conductor structure and resistance first, then the coating alloy, thickness and the joining process for the cell metallization. Copper-base options remain a separate route in the PV ribbon range.
Check a candidate in three stages
- Material and line fit: verify the drawing dimensions, surface, coating and reel arrangement against the intended feed and stringing equipment.
- Representative joints: record wetting, alignment, peel behavior, resistance and cell inspection with material lots and process settings.
- Module evaluation: use the exact bill of materials and the project’s required thermal cycling, damp heat, EL and other qualification tests.
Compare candidates at the required resistance and module layout, including consumption and yield. A ribbon procurement-saving percentage uses the procurement cost of the ribbon being replaced as its denominator, not total module manufacturing cost.
Use the complete PV ribbon procurement guide and composite ribbon article to prepare the trial.
Application specification record — open worksheet
Record your project requirements and observations, then download or include them in an inquiry.
| Item | Information / units | Your input |
|---|---|---|
| Cell and current path | Cell technology, contact layout, interconnect/busbar role and copper baseline | |
| Conductor and coating | Bare / finished section, layer basis, solder coating, temper and spool | |
| Stringer and trial | Equipment, temperature/time/speed/tension; peel/DCR/EL and module test records |
Other formats and preview
Save or restore a draft
Drafts stay in this browser. Clear inputs also removes the saved draft.
Worksheet version: RT-RFQ-WORKSHEET-1.


