Agree the validation record
Set the sequence and timing from the actual test dependencies.
| Stage | Record and decision |
|---|---|
| Sample definition | Drawing revision, material/layer construction, sample quantity, lot identifier and reference |
| Incoming checks | Dimensions, surface, packaging, identification and available lot documents |
| Material checks | Resistance at stated temperature, mechanical specimen/method and layer cross-sections as applicable |
| Process trial | Actual bending, winding, welding, soldering or termination settings and observations |
| Assembly tests | Required joint resistance/strength, insulation, heating, cycling or exposure checks |
| Review and release | Results against limits, deviations, owner, corrective action and approval scope |
Record every result with its conditions
A method name alone does not define a comparable result.
| Result field | What to record |
|---|---|
| Identification | Sample/lot, reference part, drawing and process revision |
| Method | Method/edition, specimen geometry, gauge length, fixture and equipment |
| Conditions | Temperature, duration, load, speed, bend radius or joining profile as relevant |
| Acceptance | Specified limit and its source; measured result and uncertainty where required |
| Disposition | Pass/fail for the agreed check, open issue, responsible person and next action |
