Skip to main content
Send an Inquiry 中文

Engineering application guide

CCS Conductors for Grounding and Infrastructure

Specify the conductor’s role in the grounding or infrastructure system, its dimensions, connection method and service environment. For buried or exposed installations, include the soil or corrosion conditions and the design requirements that govern the conductor and its joints.

Send Your Grounding Conductor Specification
On this page

Separate electrical and mechanical roles

Scroll horizontally to read all columns. Keep the conditions and units with each value.

Installed part Specification focus
Grounding or bonding conductor Fault duty, section, connections and installation environment
Earth electrode Electrode geometry, site interface and grounding-system design
Mechanical or support strand Wire construction, lay, breaking load and installed tension

Round wire and finished strand have different specimens and test quantities. Keep the wire lot, strand construction and terminal identity with the installation record; a general construction photograph does not establish those details.

Specify the conductor and connections

Include the conductor role, cross-section or strand construction, connection method, soil or exposure conditions, and fault-current duty/design specification. Use the required CCS grade and copper layer rather than a generic family conductivity.

Illustration of copper-clad steel conductor placement in a grounding connection.
Copper-clad steel conductor placement in a grounding connection. View full-size illustration

Assess the installed system

Corrosion assessment includes the copper layer, exposed cut ends, joints, actual medium and protective measures. A salt-spray duration cannot be converted directly into service life. Grounding and lightning-protection requirements apply to the defined installation and its connections. CCS Round Wire · CCS Stranded Wire

CCS Conductors for Grounding and Infrastructure
Application specification record — open worksheet

Record your project requirements and observations, then download or include them in an inquiry.

ItemInformation / unitsYour input
Installed roleGrounding, bonding, tracer or mechanical-support duty
Construction and connectionRound wire or strand, section, copper layer, connector and installation method
Duty and recordFault current/duration or tracer signal, mechanical load, soil/exposure and required report
Other formats and preview
Save or restore a draft

Drafts stay in this browser. Clear inputs also removes the saved draft.

Worksheet version: RT-RFQ-WORKSHEET-1.

RFQ Request Quote Discuss your specification WhatsApp
Request Quote WhatsApp