PV Ribbon Samples: Fees and Validation Checklist
Before requesting PV ribbon samples, agree on the specification, quantity, documentation, fees and shipping terms. Use this checklist to record the test conditions, acceptance criteria and results needed for your qualification process.
On this page
Write the sample specification
- Provide a drawing with base or layer construction, dimensions, tolerances, coating and mechanical condition. Include cell metallization and intended joining equipment.
- State sample length or quantity, packaging and traceability needs. Distinguish a handling sample from one intended for electrical, peel or module qualification.
Agree practical arrangements
- Ask about current availability, setup needs, sample charges, shipping responsibility and the proposed schedule. Record the agreed sample fee and freight responsibility before the sample order.
- Confirm which inspection documents, cross-sections or declarations can accompany the sample. Required documents should be explicit in the sample agreement.
Define the trial
- Record joining settings, reference material and acceptance methods before testing. For peel results, define direction, speed, specimen condition and failure classification.
- Check dimensions, coating, resistance and forming or handling as relevant. Module tests apply to the actual bill of materials; a material sample alone does not qualify the module.
Close the evaluation
- Keep sample identification, settings, results and deviations together. Distinguish passing the agreed sample checks from approval of a production route or substitute.
- Confirm the production specification, quantities, inspection plan and change controls before placing an order. Use the accepted process window for production.
Sample specification, fees and shipping agreement
Add your project inputs, then download the worksheet or send it with an inquiry. The fields start blank; entries are your requirements and observations.
Scroll horizontally to read all columns. Keep the conditions and units with each value.
| Item | Information / units | Your input |
|---|---|---|
| Sample identity | Drawing/revision, construction, round diameter or flat width/thickness, tolerances and coating | |
| Quantity and format | Quantity/unit, spool or cut-length format, labeling and sample/batch identification | |
| Sample fee | Quoted fee/currency, included work and any eligibility or refund conditions | |
| Shipping | Destination, freight/customs responsibility, transport terms and quoted cost | |
| Timing | Confirmed specification date, preparation/inspection milestone, dispatch and transport separately | |
| Records | Requested analysis/conformity/inspection records and traceable sample identity | |
| Trial ownership | Test owner, sample/reference lots, acceptance/release owner and feedback date |
Drafts are stored only in this browser when you choose Save. Clear inputs also removes the saved draft. Worksheet version: RT-RFQ-WORKSHEET-1.
Sample validation methods
Add your project inputs, then download the worksheet or send it with an inquiry. The fields start blank; entries are your requirements and observations.
Scroll horizontally to read all columns. Keep the conditions and units with each value.
| Item | Information / units | Your input |
|---|---|---|
| Geometry and coating | Round diameter or flat width/thickness; bare/finished dimensions, coating by face, instrument and sample locations | |
| Electrical | Measurement temperature, specimen length/metal section, connection method and resistance/conductivity units | |
| Tensile and elongation | Specimen geometry, gauge length, material condition, speed and proof-stress definition | |
| Bend and handling | Bend axis/direction, radius, cycle count, winding/tension and surface/insulation checks | |
| Joining and peel | Cell/ribbon lots, flux/profile, peel angle/direction, speed, fixture and failure location | |
| Module or assembly trial | Matched reference/changed design, EL or other required tests, exposure and release criteria |
Drafts are stored only in this browser when you choose Save. Clear inputs also removes the saved draft. Worksheet version: RT-RFQ-WORKSHEET-1.
Question and answer
What should be agreed before requesting samples?
Confirm the construction, quantity, test purpose, documents, sample fee, freight responsibility and target dates for that request.