CCS and Copper Stranded Conductors
Match the electrical and installation requirements first, then compare strand construction, resistance, strength, connections and handling for the complete conductor.
Engineering comparison
Scroll horizontally to view all columns.
On narrow screens, scroll to see all columns.
| Decision | CCS stranded wire | copper stranded wire | Acceptance basis |
|---|---|---|---|
| Stranded construction | Copper-clad steel strands in a defined lay | Copper strands in a defined lay | Specify strand count, strand diameter, lay direction and finished section. |
| Electrical and mechanical duty | Steel-core construction needs resistance and mechanical-duty checks | Copper grade and stranding need resistance and mechanical-duty checks | Match fault duty, length, section and allowable thermal rise; equal strand count is not equal resistance. |
| Terminations | Check tool fit, surface condition and exposed strand ends | Check tool fit, copper condition and strand consolidation | Test the finished connection for pull-out and contact resistance. |
| Bending and cost | Include lay, bend limits and qualified termination operations | Include lay, bend limits and qualified termination operations | Compare accepted installed assemblies; obtain system-owner approval before substitution. |
CCS and Copper Stranded Conductors: comparison record
Add your project inputs, then download the worksheet or send it with an inquiry. The fields start blank; entries are your requirements and observations.
| Item | Information / units | Your input |
|---|---|---|
| Comparison basis | Choose a common basis; no automatic equivalence is inferred | |
| Baseline and candidate | Materials, construction, form and drawing revisions | |
| Stranded construction | Copper-clad steel strands in a defined lay | Copper strands in a defined lay · Specify strand count, strand diameter, lay direction and finished section. | |
| Electrical and mechanical duty | Steel-core construction needs resistance and mechanical-duty checks | Copper grade and stranding need resistance and mechanical-duty checks · Match fault duty, length, section and allowable thermal rise; equal strand count is not equal resistance. | |
| Terminations | Check tool fit, surface condition and exposed strand ends | Check tool fit, copper condition and strand consolidation · Test the finished connection for pull-out and contact resistance. | |
| Bending and cost | Include lay, bend limits and qualified termination operations | Include lay, bend limits and qualified termination operations · Compare accepted installed assemblies; obtain system-owner approval before substitution. | |
| Methods, conditions and evidence | Units, test conditions, result source and reviewer |
Drafts are stored only in this browser when you choose Save. Clear inputs also removes the saved draft. Worksheet version: RT-RFQ-WORKSHEET-1.
Products and specifications
Include the drawing, intended application and acceptance criteria when requesting a comparison.
Share the stranded-conductor specification