Skip to main content
Send an Inquiry 中文

Web checklist

Solar Module Interconnection RFQ Checklist

Prepare the cell layout, current paths, ribbon dimensions, solder coating and stringer settings. Add the peel-strength, resistance and module-reliability criteria that will be used to compare samples.

Start with your drawing or these five inputs

Send the current drawing with its revision, or outline the material, geometry and application below. The complete specification checklist remains available for the next technical review.

Module and process
Cell layout, current paths and stringer model/settings
Ribbon geometry
Interconnect or busbar role; round diameter or flat width/thickness and tolerances
Material and coating
Base/layer construction, solder alloy, coating thickness and solderable zones
Mechanical handling
Temper/strength targets, camber, spool format and feeding direction
Quantity and delivery
Trial/order quantity, packaging, destination and required records
Send the drawing or initial brief
Cell contactsCell interconnectString busbarModule connection
Functional positions only. Shape, joining area and connection hierarchy follow the actual assembly drawing.
Complete specification criteria
SpecificationSelection criteria
Module and processCell layout, current paths and stringer model/settings
Ribbon geometryInterconnect or busbar role; round diameter or flat width/thickness and tolerances
Material and coatingBase/layer construction, solder alloy, coating thickness and solderable zones
Mechanical handlingTemper/strength targets, camber, spool format and feeding direction
Trial acceptanceJoint-strength method, resistance length/temperature and module check criteria
Comparison recordCurrent copper baseline, proposed ribbon, test conditions and sample results
Quantity and deliveryTrial/order quantity, packaging, destination and required records
Sample planningLaboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination.
Specification and inspectionSpecification revision, inspection records and agreed deviations.
Delivery and lot recordSpool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records.
Solar Module Interconnection RFQ Checklist: project worksheet — open worksheet

Record your project requirements and observations, then download or include them in an inquiry.

ItemInformation / unitsYour input
Module and processCell layout, current paths and stringer model/settings
Ribbon geometryInterconnect or busbar role; round diameter or flat width/thickness and tolerances
Material and coatingBase/layer construction, solder alloy, coating thickness and solderable zones
Mechanical handlingTemper/strength targets, camber, spool format and feeding direction
Trial acceptanceJoint-strength method, resistance length/temperature and module check criteria
Comparison recordCurrent copper baseline, proposed ribbon, test conditions and sample results
Quantity and deliveryTrial/order quantity, packaging, destination and required records
Sample planningLaboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination.
Specification and inspectionSpecification revision, inspection records and agreed deviations.
Delivery and lot recordSpool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records.
Other formats and preview
Save or restore a draft

Drafts stay in this browser. Clear inputs also removes the saved draft.

Worksheet version: RT-RFQ-WORKSHEET-1.

Product and test information

Send the completed RFQ details
RFQ Request Quote Discuss your specification WhatsApp
Request Quote WhatsApp