Web checklist
Solar Module Interconnection RFQ Checklist
Prepare the cell layout, current paths, ribbon dimensions, solder coating and stringer settings. Add the peel-strength, resistance and module-reliability criteria that will be used to compare samples.
Start with your drawing or these five inputs
Send the current drawing with its revision, or outline the material, geometry and application below. The complete specification checklist remains available for the next technical review.
- Module and process
- Cell layout, current paths and stringer model/settings
- Ribbon geometry
- Interconnect or busbar role; round diameter or flat width/thickness and tolerances
- Material and coating
- Base/layer construction, solder alloy, coating thickness and solderable zones
- Mechanical handling
- Temper/strength targets, camber, spool format and feeding direction
- Quantity and delivery
- Trial/order quantity, packaging, destination and required records
Cell contactsCell interconnectString busbarModule connection
Complete specification criteria
| Specification | Selection criteria |
|---|---|
| Module and process | Cell layout, current paths and stringer model/settings |
| Ribbon geometry | Interconnect or busbar role; round diameter or flat width/thickness and tolerances |
| Material and coating | Base/layer construction, solder alloy, coating thickness and solderable zones |
| Mechanical handling | Temper/strength targets, camber, spool format and feeding direction |
| Trial acceptance | Joint-strength method, resistance length/temperature and module check criteria |
| Comparison record | Current copper baseline, proposed ribbon, test conditions and sample results |
| Quantity and delivery | Trial/order quantity, packaging, destination and required records |
| Sample planning | Laboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination. |
| Specification and inspection | Specification revision, inspection records and agreed deviations. |
| Delivery and lot record | Spool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records. |
Solar Module Interconnection RFQ Checklist: project worksheet — open worksheet
Record your project requirements and observations, then download or include them in an inquiry.
| Item | Information / units | Your input |
|---|---|---|
| Module and process | Cell layout, current paths and stringer model/settings | |
| Ribbon geometry | Interconnect or busbar role; round diameter or flat width/thickness and tolerances | |
| Material and coating | Base/layer construction, solder alloy, coating thickness and solderable zones | |
| Mechanical handling | Temper/strength targets, camber, spool format and feeding direction | |
| Trial acceptance | Joint-strength method, resistance length/temperature and module check criteria | |
| Comparison record | Current copper baseline, proposed ribbon, test conditions and sample results | |
| Quantity and delivery | Trial/order quantity, packaging, destination and required records | |
| Sample planning | Laboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination. | |
| Specification and inspection | Specification revision, inspection records and agreed deviations. | |
| Delivery and lot record | Spool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records. |
Other formats and preview
Save or restore a draft
Drafts stay in this browser. Clear inputs also removes the saved draft.
Worksheet version: RT-RFQ-WORKSHEET-1.