Web checklist
Composite PV Ribbon Trial Checklist
Prepare the cell layout, conductor geometry, coating and stringing conditions, then define the measurements needed to compare the sample with the current ribbon.
Start with your drawing or these five inputs
Send the current drawing with its revision, or outline the material, geometry and application below. The complete specification checklist remains available for the next technical review.
- Cell and baseline
- Cell layout, stringer model and the copper ribbon used for comparison
- Conductor geometry
- Round: bare/finished diameter; flat: width, thickness and coating allowance
- Layer construction
- Core/outer metals, copper ratio and mass or volume basis
- Coating and process
- Coating alloy and thickness, soldering conditions and spool handling
- Quantity and destination
- Sample and production quantities, delivery country and required documents
Cell contactsCell interconnectString busbarModule connection
Complete specification criteria
| Specification | Selection criteria |
|---|---|
| Cell and baseline | Cell layout, stringer model and the copper ribbon used for comparison |
| Conductor geometry | Round: bare/finished diameter; flat: width, thickness and coating allowance |
| Layer construction | Core/outer metals, copper ratio and mass or volume basis |
| Coating and process | Coating alloy and thickness, soldering conditions and spool handling |
| Trial record | Baseline copper / proposed composite / test conditions / result for resistance, joint strength and module checks |
| Packaging | Spool, winding direction, tension, camber and splice requirements |
| Quantity and destination | Sample and production quantities, delivery country and required documents |
| Sample planning | Laboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination. |
| Specification and inspection | Specification revision, inspection records and agreed deviations. |
| Delivery and lot record | Spool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records. |
Composite PV Ribbon Trial Checklist: project worksheet — open worksheet
Record your project requirements and observations, then download or include them in an inquiry.
| Item | Information / units | Your input |
|---|---|---|
| Cell and baseline | Cell layout, stringer model and the copper ribbon used for comparison | |
| Conductor geometry | Round: bare/finished diameter; flat: width, thickness and coating allowance | |
| Layer construction | Core/outer metals, copper ratio and mass or volume basis | |
| Coating and process | Coating alloy and thickness, soldering conditions and spool handling | |
| Trial record | Baseline copper / proposed composite / test conditions / result for resistance, joint strength and module checks | |
| Packaging | Spool, winding direction, tension, camber and splice requirements | |
| Quantity and destination | Sample and production quantities, delivery country and required documents | |
| Sample planning | Laboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination. | |
| Specification and inspection | Specification revision, inspection records and agreed deviations. | |
| Delivery and lot record | Spool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records. |
Other formats and preview
Save or restore a draft
Drafts stay in this browser. Clear inputs also removes the saved draft.
Worksheet version: RT-RFQ-WORKSHEET-1.