Web checklist
Composite Busbar Ribbon RFQ Checklist
Provide the module current path, ribbon dimensions, conductor structure, coating and joint details, plus the resistance and packaging requirements.
Start with your drawing or these five inputs
Send the current drawing with its revision, or outline the material, geometry and application below. The complete specification checklist remains available for the next technical review.
- Module current path
- String layout, collected current, path length and junction-box connection drawing
- Section and layers
- Width, thickness, tolerances and copper-aluminum construction
- Joining
- Mating materials, solder or welding process, overlap and coating alloy
- Resistance
- Body and joint resistance with measurement length, points and temperature
- Quantity and destination
- Trial and order quantity, destination and required shipment records
Cell contactsCell interconnectString busbarModule connection
Complete specification criteria
| Specification | Selection criteria |
|---|---|
| Module current path | String layout, collected current, path length and junction-box connection drawing |
| Section and layers | Width, thickness, tolerances and copper-aluminum construction |
| Joining | Mating materials, solder or welding process, overlap and coating alloy |
| Resistance | Body and joint resistance with measurement length, points and temperature |
| Trial object | Ribbon, joint or module; define peel, thermal-cycle or damp-heat checks for the relevant object |
| Supply format | Spool or cut length, winding direction and coil mass |
| Quantity and destination | Trial and order quantity, destination and required shipment records |
| Sample planning | Laboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination. |
| Specification and inspection | Specification revision, inspection records and agreed deviations. |
| Delivery and lot record | Spool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records. |
Composite Busbar Ribbon RFQ Checklist: project worksheet — open worksheet
Record your project requirements and observations, then download or include them in an inquiry.
| Item | Information / units | Your input |
|---|---|---|
| Module current path | String layout, collected current, path length and junction-box connection drawing | |
| Section and layers | Width, thickness, tolerances and copper-aluminum construction | |
| Joining | Mating materials, solder or welding process, overlap and coating alloy | |
| Resistance | Body and joint resistance with measurement length, points and temperature | |
| Trial object | Ribbon, joint or module; define peel, thermal-cycle or damp-heat checks for the relevant object | |
| Supply format | Spool or cut length, winding direction and coil mass | |
| Quantity and destination | Trial and order quantity, destination and required shipment records | |
| Sample planning | Laboratory sample, process trial and production quantities; acceptance criteria, schedule and delivery destination. | |
| Specification and inspection | Specification revision, inspection records and agreed deviations. | |
| Delivery and lot record | Spool/coil interface, core/OD/net weight, continuous length, joints/splices and marking, package/lot identity and required shipping records. |
Other formats and preview
Save or restore a draft
Drafts stay in this browser. Clear inputs also removes the saved draft.
Worksheet version: RT-RFQ-WORKSHEET-1.