TECHNICAL REFERENCES · POWER CABLES
CCA Cable Specifications: Find the Relevant Application
Identify the cable type, conductor position and document issue before selecting a wire specification.
Find Your Project PathFind your project path
ENEL Italy
- Conductor position
- Concentric conductor in the specified LV constructions
- Reference issue
- GSCC014 Rev.00 — Amendment 01/2025
- Application scope
- LV concentric-neutral construction in the cited Italian specification.
Grupo EPM Colombia
- Conductor position
- LV phase and neutral in the cited service-cable specification
- Reference issue
- ET-TD-ME01-18 Rev.2 — 2018
- Application scope
- Historical LV service-cable reference, Revision 2 (2018).
Eskom South Africa
- Conductor position
- Specified LV service / control cable pilot or trial
- Reference issue
- 240-56063805 Rev.3 §3.2.1(c)
- Application scope
- Pilot / trial provision for the specified copper-clad aluminum-alloy construction.
MV metallic screen
- Conductor position
- MV metallic wire screen
- Reference issue
- Customer project specification
- Application scope
- MV screen design uses its assigned fault duty, bonding arrangement and cable requirements.
Published Low-Voltage References
LV concentric-conductor specification
ENEL — Italy
GSCC014 · Rev.00 — Amendment 01/2025
The 01/2025 amendment includes CCA concentric conductors for Italian Type I–III low-voltage cables. Confirm the specified construction and resistance for your project. The equalizing tape remains annealed copper: required for Types II–III and optional for Type I.
Combined PDF pp. 55, 59–60; §5.5 and Table 4.1 (amendment pp. 5–6)
Read the source: GSCC014 Rev.00 — Amendment 01/2025Published 2018 service-cable reference
Grupo EPM — Colombia
ET-TD-ME01-18 · Rev.2 — published 2018
The published Rev.2 describes 1×6+6 AWG and 2×6+6 AWG concentric service cables, 600 V, 90°C, XLPE/XLPE, with CCA phase and neutral conductors. Check the CENS catalogue and confirm the controlled issue required for a new project.
PDF pp. 1–2: revision; p. 6: cable configurations and conductor positions
Read the source: ET-TD-ME01-18 Rev.2 — published 2018The source documents define the cable constructions and material requirements covered by each reference.
Detailed reference-use boundaries
Match the Reference to the Conductor Duty
| Duty | How to use the reference | Scope boundary |
|---|---|---|
| Italian LV concentric neutral | Use the specified ENEL amendment for construction and resistance inputs. | Do not extend it to all ENEL countries, cable types or MV screens. |
| EPM historical service cable | Use the published 2018 Rev.2 and confirm the issue required by the project. | Do not infer current purchasing or an established supplier relationship. |
| MV metallic screen | Start from the project specification, screen-assigned fault duty and actual construction. | Do not use the LV documents as an MV material approval. |
| LV service and multi-core control trial | Use Eskom Rev.3 §3.2.1(c) only within its pilot / trial scope. | Do not describe it as general approval for regular procurement. |
A Limited Trial Reference
Pilot / trial provision
Eskom — limited trial provision
240-56063805 · Rev.3
The cited Rev.3 includes CCAA or aluminium-alloy conductors for specified LV service and multi-core LV control cables in pilot or trial projects of new conductor types. CCAA means copper-clad aluminium alloy. This is a trial route, not general purchasing approval.
PDF p. 5, §2.4: CCAA definition; p. 6, §3.2.1(c): pilot / trial scope
Read the source: 240-56063805 Rev.3From a Document to a Wire Inquiry
- Document and issue
- Conductor position
- Resistance and construction
- Individual wire specification
- Sample and finished-cable validation
Send the applicable issue, conductor position, resistance target, wire diameter and count, copper-fraction basis and trial quantity. Keep source requirements, calculated references and measured product-lot results separate.
Discuss a Wire SpecificationStart with your copper-wire drawing
Choose a quotation, a sample request or a specification recommendation. Add the drawing and details you have in the shared inquiry form.
The inquiry form accepts one drawing or specification up to 20 MB. File content and type are checked before notification. Keep source requirements separate from your calculated scheme and project inputs.
Email and WhatsApp open a draft; you decide what to attach and send.
Raytron — Engineering Every Micron.
Share the drawing-review checklist with your team
These two-page checklists cover inquiry inputs, model assumptions, inspection methods, trial steps and project responsibilities.
Related Power-Cable Applications
LV Concentric Neutral & Service Cables
CCA wire selection around resistance targets, cable construction and utility references.
Explore LV Concentric Neutral & Service CablesMV Metallic Screen Wire
Compare screen resistance, fault duty, geometry and connection requirements.
Explore MV Metallic Screen Wire